B6. SCOPE OF WORK
B6.1 The Work to be done under the subsequent Contract shall consist of rehabilitation of the pool area at the Seven Oaks Pool.
(a) The Seven Oaks Pool area will be closed to the public and the remaining main entrance, locker rooms and splash pad areas of the facility will remain open to the public for the duration of the rehabilitation.
B6.2 The major components of the Work are as follows:(a) General Requirements:
(i) General coordination, management, supervision and administration as typically assigned responsibilities of a general contractor of the project as a general contractor either self performing and/or retaining subcontractors for the work outlined below.
(ii) Contractors self-performing and subcontractors retained to complete work outlined below shall meet qualification requirements specified in the Tender for the project. Prior to award of the Tender, the successful Bidder shall provide evidence that contractors self performing and subcontractors meet the qualification requirements specified in the Tender. Contractors self-performing and subcontractors found not to meet the qualifications specified in the Tender shall be rejected and the Contractor shall replace unqualified trades with qualified subcontractors at no increase in Contract Price or Contract Time.
(iii) Prime Contractor as defined by workplace safety and health legislation.
(iv) Segregation of construction areas from publicly occupied areas of the facility.
(v) Dust control: The Work includes demolition of concrete and mortar materials within the pool area. Dust generated by work with concrete and mortar materials may be a safety and health hazard as well as creating a risk of contamination of surfaces and areas of the facility outside of the established work areas. The contractor shall be responsible to develop, implement and maintain a dust control program and procedures to control the generation of dust within construction areas and the spread of dust from construction areas to other areas of the facility. The Contractor shall retain a qualified and experienced environmental practitioner to design and audit the dust control program.
(b) Architectural:
(i) Demolition of existing mortar bed, ceramic tiles tiling setting mortar and grout to expose underlaying structural concrete of the pool tank floor and walls and deck floor within 600mm of the tank walls.
(ii) Removal, salvage, storing and re-installation of deck fittings such as ladders and lifeguard chairs within the area of tile demolition.
(iii) Removal, salvage, storing and re-installation, or protection and shoring in place of the existing pool divider bulkheads.
(iv) Installation of replacement mortar bed, waterproofing membrane, tile setting mortar ceramic tiles and tile grout (tile system) by trades meeting specified qualification requirements at locations of tile demolition. Tile system shall include lettering and graphics as shown on the Tender drawings. Coordination of tile system with Structural, mechanical, and electrical components.
(v) Re-installation of deck fixtures salvaged.
(c) Structural:
(i) Contractors self-performing and/or subcontractors completing structural work shall meet the qualifications specified in the Tender.
(ii) Repair to concrete structure by specific concrete restoration methods specified in the Tender.
(iii) Installation of anchors for deck fixtures removed, rope anchors removed, mechanical fittings, and infilling of existing through tank wall windows and lights by methods specified in the Tender.
(d) Mechanical:
(i) Contractors self-performing and/or subcontractors completing mechanical work shall meet the qualifications specified in the Tender.
(ii) Removal and replacement of existing tank main drains, pool inlet fittings, and vacuum port fittings including associated piping through concrete tank walls and floors.
(e) Electrical:
(i) Contractors self-performing and/or subcontractors completing electrical work shall meet the qualifications specified in the Tender.
(ii) Removal and replacement of pool area bonding system.
(iii) Demolition of existing through tank wall light fixtures.
B6.3 The Project is estimated to cost $1,880,000.00 (not including GST).